Steel Buildings in Sept-Îles
Steel buildings engineered for the North Shore's harsh climate. Heavy snow and strong coastal winds are accounted for by our OIQ engineers from the design stage.
Head office: 324 Rue Des Forges, Trois-Rivières · Projects of 3,200 sq ft and up
Areas Served
We ship and install steel buildings in Sept-Îles, including the Sept-Îles industrial park, the port area and Uashat. You speak directly with the people who design and erect your building.
Snow Load, Côte-Nord
Our steel frames are sized per Appendix C of NBC 2020 for the Sept-Îles area (total Ss + Sr ≈ 5,5 kPa / 114.9 psf). No structural surprises during January's heaviest storms.
OIQ + RBQ Compliance
All our buildings are signed and sealed by an OIQ engineer and compliant with the municipal requirements of Sept-Îles. RBQ license 5873-1456-01.
Steel Buildings Delivered to Sept-Îles

Commercial
Warehouses, showrooms and distribution centers for businesses in Sept-Îles and surrounding areas.

Industrial
Manufacturing plants, workshops and service garages designed for industrial parks in Sept-Îles.

Agricultural
Hay barns, stables and livestock buildings for farms in the Sept-Îles region.
Why Choose Metbec in Sept-Îles
- 100% Quebec supplier, engineer-stamped plans (OIQ)
- Buildings engineered for the local snow and wind loads in Sept-Îles
- Shipped directly to your site anywhere in Quebec, logistics handled by Metbec
- Familiarity with Quebec municipal zoning regulations
- Wide selection of panel colors and finishes
- Free 3D Studio to visualize your building before quoting
Frequently Asked Questions, Sept-Îles
Does Metbec serve Sept-Îles?+
Yes. Our head office is at 324 Rue Des Forges in Trois-Rivières. All our steel buildings are shipped directly to your site in Sept-Îles, anywhere in Quebec. Metbec handles the entire logistics. Design and installation are 100% Quebec-based.
What snow load do you use for a building in Sept-Îles?+
Per Appendix C of NBC 2020 for Sept-Îles, we design with a total snow load (Ss + Sr) of approximately 5,5 kPa (114.9 psf) and a reference wind pressure of about 0,50 kPa. Our OIQ engineers fine-tune those loads to your exact site address.
Do I need a municipal permit in Sept-Îles for a steel building?+
The City of Sept-Îles requires a building permit. Our OIQ-stamped plans include calculations for the high snow and wind loads of the Côte-Nord.
Ready to launch your steel building in Sept-Îles?
Budget quote within 48 to 72 hours, or design your building live in our free 3D Studio.