    Metbec prefabricated steel warehouse with loading docks in Quebec

    100% Quebec · OIQ plans

    Steel warehouses for every industry

    Large surfaces and long column-free spans, insulated or uninsulated. A custom steel structure, delivered and erected by one single company.

    • Large surfaces
    • Long column-free spans
    • Insulated or uninsulated
    • Detailed estimate in 48–72 h
    200 pi
    clear span, no columns
    1
    single company, from plan to delivery
    OIQ
    engineer-stamped plans
    48-72 h
    to receive your estimate

    A warehouse for every industry

    Whatever you store, we design a steel structure suited to your goods, handling and growth.

    Transport & logistics

    Cross-docks, loading docks

    Manufacturing

    Raw materials and finished goods

    Agriculture

    Grain, hay, machinery

    Retail & distribution

    Stock, pallets, orders

    Construction

    Materials and heavy equipment

    Food

    Tempered or heated storage

    Municipal

    Abrasives, vehicles, equipment

    Rental & storage

    Rental space, self-storage

    Warehouse examples by industry

    Agricultural, commercial or industrial: the same steel frame, adapted to each use.

    Illustrative images.

    Our strength

    Large surfaces, long column-free spans

    The steel frame crosses long distances without any mid-span posts. Every square foot is usable for racking, forklifts and trucks.

    • Up to 200 ft clear span — no posts in the middle
    • Areas from 3,200 sq ft — and well beyond, as needed
    • High clear height — for racking and equipment
    • Easy expansion — add bays later
    Large column-free steel warehouse with racking

    Insulated or uninsulated: your choice

    Depending on what you store, your warehouse can be insulation-ready or left uninsulated to lower the cost.

    Insulated warehouse

    Insulated warehouse

    For goods sensitive to cold or moisture, or spaces used year-round.

    • Tempered or heated storage
    • Less condensation
    • Worker comfort in winter
    Price this building
    Uninsulated warehouse

    Uninsulated warehouse

    The most economical option for equipment, materials and cold-tolerant goods.

    • Lower upfront cost
    • Ideal for machinery and materials
    • Can be insulated later
    Price this building
    Steel warehouse interior with office mezzanine

    Why steel instead of wood?

    High-performance steel

    High-strength galvanized steel: stronger, lighter and longer-lasting than wood.

    No rot, no rodents

    Galvanized steel doesn't rot and attracts neither mice nor insects.

    100% usable space

    No mid-span columns: forklifts and racking without constraints.

    Operational sooner

    Erection 3–5× faster than traditional construction.

    A complete product. One single company.

    No more juggling 5 suppliers. With Metbec, you have one point of contact from the first call to your frame erection.

    Design
    OIQ engineering
    Delivery
    Frame installation

    Metbec steel vs wood structure

    CriteriaMetbec steelWood
    Lifespan50+ years20–30 years
    Column-free spanUp to 200 ftLimited, posts required
    Rot and moistureNoneHigh risk
    Rodents and insectsNo attractionVulnerable
    Fire resistanceNon-combustibleCombustible
    Clear height for racking30+ ftLimited
    MaintenanceMinimalFrequent (paint, parts)
    Erection speed3–5× fasterSlower
    Future expansionSimple, modularComplex

    What Metbec delivers

    Full transparency: you know exactly what's included.

    Included

    • Steel frame (columns, rafters, purlins, girts)
    • Pre-painted steel roof and wall panels
    • Doors, trims and hardware
    • OIQ-stamped engineering drawings for your permit
    • Direct delivery to your site
    • Steel frame installation

    By your contractor

    • Foundations and concrete slab
    • Interior and exterior cladding installation

    Everything else (design, engineering, delivery, frame installation) is handled by Metbec.

    From project to delivery

    1. Your project

    Size, use, region: quote in 48–72 h.

    2. OIQ plans

    4–5 weeks for sealed permit drawings.

    3. Production

    Structure produced to measure for your warehouse.

    4. Delivery

    Delivered to site: 12–14 weeks total.

    How much would your warehouse cost?

    Tell us your size and use: an advisor sends a detailed estimate within 48–72 h. Free, no obligation.

    Or design it yourself in our 3D Studio →

    Project examples

    A few steel warehouse design examples by our team in Quebec.

    Typical uses

    Palletized storage and high-density racking
    Regional distribution center
    Cross-docking and logistics
    Cold storage (with insulation)
    Construction material storage

    Benefits

    • Clear ceiling up to 40 ft for vertical racking
    • Oversized doors for semi-trailer trucks
    • Built 3 to 5 times faster than concrete or wood
    • Scalable: modular extensions possible

    Specifications

    Typical width
    80 to 300 ft
    Typical length
    100 to 600 ft
    Wall height
    18 to 40 ft
    Structure type
    Clear-span rigid frames

    Frequently asked questions

    What clear height should I plan for pallet racking in a steel warehouse?

    For standard 3-level racking, plan 24 to 28 feet of clear height under truss; for 5 to 6 levels or very narrow aisle, target 32 to 40 feet. Our clear-span rigid frames deliver these heights column-free up to 300 feet of span.

    Should a steel warehouse be insulated in Quebec?

    For an unheated warehouse, R-20 roof insulation is enough to control condensation. For tempered or cold storage, target R-30 to R-40 on walls and R-40 to R-60 on the roof, using sandwich panels for maximum airtightness.

    What truck openings should be integrated into a logistics warehouse?

    For semi-trailers, plan 12' × 14' grade-level sectional doors and 9' × 10' loading docks with hydraulic levelers every 45 to 60 feet. We reinforce the steel headers to prevent any envelope deformation.

    Can a steel warehouse be expanded without interrupting operations?

    Yes, provided a removable end wall and future loads were planned at initial design. A lateral or lengthwise extension is typically erected in 3 to 5 weeks on site with partial access maintained.

    Planning a steel warehouse project?

    Get a personalized quote within 48-72 h. Minimum 3,200 sq ft.